EasyManua.ls Logo

Summer 27980 - Remove Gate Frame; Mark Wall Cup Placement

Summer 27980
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
wall cup/top of stairs installation (continued):
2
nd
Remove frame.
Mark drill
holes with a
pencil through
the center
of the wall cups.
6
2
3
Squeeze release
latches on both sides
of foot pedal and lift up.
1
st
Place the center of the
wall cup over the center
of the circular outline
on the wall.
Place the center of the
wall cup over the center
of the circular outline
on the wall.
x4
x 4
B

Related product manuals