EasyManua.ls Logo

Sun2Solar 475175 - Yolk and Bearing Assembly; Strap Attachment to Tube

Sun2Solar 475175
6 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
NOTE:
Rail attachment
brackets should be mounted so
that base slides toward pool water.
- Drill pilot hole for brackets.
- Insert screws (M) provided to attach base to top rail.
Yolk & Bearing Casing/Pins
- Place yolk (C) into base mounted to the top rail
- Insert bearing pins (G) inside casing tube (F). Place completed bearings in yolk slots.
Attaching Straps to The Tube Assembly
- Remove tube assembly from pool; place on a flat surface.
- Measure 8” in from each end of hub towards center of tube.
- Pre-drill using 1/8” drill bit
- Attach strap using screw (L).
NOTE:
This will be your starting point for strap attachment.
- Repeat step above 6 more times using 1 screw (L) per strap, equally spacing remainder of straps.