18
Align tab on bottom of left front corner (E) with slot on
left oor (A). Lower panel into slot and lock in place by
sliding panel toward door opening.
Note: Use a rubber mallet to “push” left front corner
(E) into locked position.
Shed Assembly/Walls (continued)
Tip left front corner (E) back to vertical position and
align lower tabs on right side with slots in oor.
Note: You will hear a snap when tab is fully engaged.
Tip left front corner (E) outward slightly and bend corner
hinge.