EasyManua.ls Logo

Suncast GS8500 - Page 9

Suncast GS8500
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17. With at least 2 people, lift the assembled roof over the Shed and
lower into place. Do not snap into place until all 5 Roof Connector F's
are lined up and partially engaged. Start at one corner and work your
way around the shed pressing down at edges of Roof to fully snap con-
nectors in place.
Next, walk inside shed and inspect all snap locations to make sure they
are all fully engaged. If not, walk back outside and press roof down
tight in the area behind the dis-engaged snap and press roof down until
it engages.
I
H_____
Side view of Fixed Roof Panel placementO
9
16. Take Fixed Roof Panel and place it on clean, level surface upside
down. Do not place on a surface that can scratch top surface of
Fixed Roof Panel. Insert Fixed Roof Connector F into Roof Connector
receptacle in roof. Press to snap in place. Repeat process for
remaining four Roof Connectors F's. Use small rubber mallet if
needed.
Steel Pipe: If Steel Pipe is not assembled to Fixed Roof Panel, install
pipe into groove by pushing Steel Pipe down past retainers that are
molded in Fixed Roof Panel.
F
Steel Pipe
M
Fixed Roof Panel
/
t