EasyManua.ls Logo

Sungrow SG125HX User Manual

Sungrow SG125HX
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SG125CX-P2PV
Grid-Connected InverterUser
ManualSG125CX-P2-UEN-Ver12-
202205
User Manual
PV Grid-Connected Inverter
SG125CX-P2
SG125CX-P2-UEN-Ver12-202205

Table of Contents

Other manuals for Sungrow SG125HX

Question and Answer IconNeed help?

Do you have a question about the Sungrow SG125HX and is the answer not in the manual?

Sungrow SG125HX Specifications

General IconGeneral
ModelSG125HX
Rated Output Power125kW
Maximum AC Output Power137.5kW
MPPT Efficiency99.9%
Cooling MethodSmart Forced Air Cooling
DC Connection TypeMC4
CommunicationRS485, Ethernet, WLAN, Digital Input
Operating Temperature Range-25°C to +60°C
Nominal AC Voltage400 V
Humidity Range0 - 100 %
Max. AC Power137.5kVA

Summary

About This Manual

Manual Overview and Symbols

Provides information on manual scope, target users, usage, and safety symbols.

Safety Instructions

1.1 Unpacking and Inspection

Guidance on checking the product for damage and completeness upon arrival.

1.2 Installation Safety

Critical safety steps and warnings before and during installation.

1.3 Electrical Connection Safety

Essential safety measures for electrical connections to prevent shock and damage.

1.4-1.6 Operation, Maintenance, and Disposal Safety

Safety guidelines for operating, maintaining, and disposing of the inverter.

Product Description

2.1 System and Product Overview

Introduces the inverter's role in PV systems and its model designation.

2.2 Appearance, Dimensions, and Symbols

Details the inverter's physical characteristics, dimensions, and product symbols.

2.4 LED Indicator

Explains the meaning of different LED indicator states for inverter status.

2.5 Circuit Diagram and Functions

Details the inverter's circuit diagram and core functional descriptions.

Unpacking and Storage

3.1 Unpacking and Inspection

Guidance on checking the product for damage and completeness upon arrival.

3.2 Inverter Storage Guidelines

Specifies conditions and procedures for storing the inverter before installation.

Mechanical Mounting

4.1 Mounting Safety Precautions

Critical safety warnings and requirements for mechanical installation.

4.2 Location and Environmental Requirements

Guidelines for selecting a suitable installation site and environmental conditions.

4.3 Installation Tools and Equipment

Lists recommended tools and auxiliary equipment for installation.

4.5 Mounting Bracket Installation

Detailed steps for installing the mounting bracket for various mounting types.

Electrical Connection

5.1 Electrical Connection Safety

Critical safety measures for all electrical connections to prevent hazards.

5.2 Terminal Description

Identifies and describes all electrical terminals on the inverter.

5.3 Electrical Connection Overview

Provides a general overview of the electrical connection process and cable requirements.

5.4 Crimp OT / DT Terminal

Instructions for preparing and crimping OT/DT terminals for cable connections.

5.5 External Grounding Connection

Procedures for ensuring proper external grounding of the inverter.

5.6 AC Cable Connection

Details requirements and procedures for connecting the AC power cable.

5.7 DC Cable Connection

Explains how to safely connect DC cables from PV strings.

Communication Setup

5.9 Wireless Communication Module

Instructions for installing and connecting the optional wireless communication module.

5.10 WiNet-S Connection

Setup for Ethernet and WLAN communication modules.

5.11 Communication Junction Box

Procedures for removing and installing the communication junction box.

5.13 RS485 Connection

Procedures for establishing RS485 communication for monitoring and control.

5.14 Dry Contact Connection

Setup for dry contact outputs for fault and emergency stop signals.

5.15 DRM Connection

Configuration for Demand Response Modes applicable in AU and NZ.

Commissioning

6.1 Pre-Commissioning Checks

Checklist of items to verify before starting the commissioning process.

6.2 Commissioning Procedure

Step-by-step guide to start up and configure the inverter for operation.

iSolarCloud App Usage

7.2 App Installation and Login

Guide to downloading, installing, and logging into the iSolarCloud mobile application.

7.3 Initialization and Settings

Steps for initial inverter setup, parameter configuration, and understanding the home screen.

7.6 Run Information and Records

How to view operational data, event logs, and fault history via the app.

7.8.1 System Parameters

Configuration of system-level parameters like boot/shutdown and date/time.

7.8.2 Operation Parameters

Settings for PID, AFCI, and other operational controls.

7.8.3 Power Regulation Parameters

Configuration of active and reactive power regulation functions.

7.8.5 Firmware Update

Procedure for updating the inverter's firmware using the mobile app.

7.8.6 Password Changing

How to change the user account password for security.

System Decommissioning

8.1 Disconnecting the Inverter

Safe procedures for disconnecting the inverter from power sources before service.

8.2 Dismantling the Inverter

Steps for safely removing the inverter from its mounting.

8.3 Disposal of the Inverter

Guidelines for environmentally responsible disposal of the inverter.

Troubleshooting and Maintenance

9.1 Troubleshooting Faults

Common fault codes and their corrective measures for diagnosing and resolving issues.

9.2 Maintenance Procedures

Routine maintenance tasks and notices for ensuring optimal performance and longevity.

Appendix

10.1 Technical Data

Detailed technical specifications of the inverter.

10.2 Wiring Distance of DI Dry Contact

Specifies maximum wiring distances for DI dry contact signals.

10.3 Quality Assurance

Information regarding warranty, service, and conditions for quality guarantee.

10.4 Contact Information

How to contact SUNGROW for support and inquiries.

Related product manuals