GD_202005_SH5K-30_Quick Commissioning Guide_V1.0 Page 1 of 5
© Sungrow Australia Group Pty. Ltd. All rights reserved.
The information in this document is subject to change without notice.
SH5K-30 Quick Commissioning Guide
Disclaimer
The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76
168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a
statement or advice on any of the Electrical or Solar Industry standards or guidelines. Please
observe all OH&S regulations when working on Sungrow equipment.
The commissioning phase of the SH5K-30 inverter is straight forward and simple. All
settings are done from the front panel, and there is no longer any need to manually
enter the battery details the system will automatically detect a powered-up battery.
On first initialisation, the flowing will appear on the LCD screen.
Enter to set/check the country code
Enter “AU” for AS/NZS 4777 as default
Select appropriate DNSP, or manually enter
grid protection parameters (Default DNSP power factor settings will be loaded)

Other manuals for Sungrow SH5K-30

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SH5K-30 and is the answer not in the manual?

Sungrow SH5K-30 Specifications

General IconGeneral
BrandSungrow
ModelSH5K-30
CategoryInverter
LanguageEnglish

Related product manuals