EasyManua.ls Logo

Sungrow SH3K6 User Manual

Sungrow SH3K6
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SH3.6_4.6K-UEN-Ver12-202003 Version1.2
User Manual
SH3K6 / SH4K6
Grid-Connected Hybrid
Inverter

Table of Contents

Other manuals for Sungrow SH3K6

Question and Answer IconNeed help?

Do you have a question about the Sungrow SH3K6 and is the answer not in the manual?

Sungrow SH3K6 Specifications

General IconGeneral
ModelSH3K6
Max. Input Voltage600 V
Number of MPPTs2
Total Harmonic Distortion< 3%
DC SwitchYes
Protection ClassIP65
Cooling MethodNatural convection
Protection LevelIP65
Nominal AC Voltage230 V
AC Voltage Range180-280 V
Output Voltage230 V
Nominal Grid Frequency50 Hz
Frequency50 Hz
Operating Temperature Range-25°C to +60°C
Operating Temperature-25°C to +60°C
Humidity0% - 100%

Summary

Safety

General Safety Instructions

Essential safety rules applicable to all operations involving the inverter.

Inverter Specific Warnings

Danger and warning notices specific to inverter handling, voltage, and components.

Function Description

Safety Functions Overview

Describes integrated protection, earth fault alarm, and auto-test features.

Mechanical Mounting

Mounting Safety Precautions

Critical safety warnings before and during the physical installation process.

Inverter Mounting Procedure

Step-by-step guide for physically attaching the inverter to its mounting bracket.

Grounding Connection

Instructions for correctly connecting the protective earth terminal for safety.

Electrical Connection

Energy Meter Wiring

Instructions for connecting single-phase and three-phase energy meters.

Grid Connection Procedure

Steps for connecting the inverter to the utility grid, including AC connector assembly.

PV Array Connection

Guidelines for configuring and connecting PV strings to the inverter.

Battery Cable Connections

Procedures for connecting power, CAN, and temperature sensor cables for batteries.

Commissioning

Pre-Commissioning Inspection

Checklist for verifying all installation aspects before initial startup.

Initial Commissioning Steps

Guided procedure for first-time system setup and configuration via LCD.

Troubleshooting and Maintenance

LED Indicator Troubleshooting

How to interpret LED status and resolve basic issues.

LCD Error Code Troubleshooting

Guide to viewing and diagnosing errors shown on the inverter's LCD screen.

Appendix IV: Power Response

Related product manuals