User Manual 7 Commissioning
65
Grid
side
Load
side
SET
21 22 17 18 19 20
L1 L1′ L2 L2′ L3 L3′ N
SET
21 22 17 18 19 20
L1 L1′ L2 L2′ L3 L3′ N
Grid
side
Load
side
Fig. 7-6 Correct Power cable connection for Three-phase Meter
Method 1:
Turn off all the household loads.
All the PV power generation
should be exported to the grid,
as shown in the “Correct” figure.
4000
=
~
0
4000
0
12:37
(W)
+
-
Running
C
4000
=
~
0
4000
8000
12:37
(W)
+
-
Running
C
Correct
Reverse
Method 2:
Stop the inverter via the LCD
menu and turn on the household
loads.
All the load power consumption
should be imported from the grid,
as shown in the “Correct” figure.
0
=
~
0
4000
4000
12:37
(W)
+
-
Turn off
C
0
=
~
0
4000
0
12:37
(W)
+
-
Turn off
C
Correct
Reverse
The reverse sensor connection will cause the communication fault 084.
To clear the fault 084, please turn off the DC sources and then restart
the system after reconnecting the sensor in correct direction.
7.4.2 Battery Information
After initial settings, check the detailed battery information on the LCD display.