4 Unpacking and Storing
4.1 Unpacking and Inspecting
The inverter is thoroughly tested and strictly inspected before delivery. Damage
may still occur during shipping. Therefore, the first thing you should do after
receiving the device is to conduct a thorough inspection.
1. Check the packaging for any visible damage.
2. Check the delivery contents for completeness according to the
packaging list.
3. Check the inner contents for any visible damage.
Contact SUNGROW or the distributor in case of any damaged or missing
components.
It is the best choice to store the inverter in the original packaging. So, do not
dispose of it.
750
600
265
Fig. 4-1 Single Inverter in Original Packaging Carton (unit: mm)