EasyManua.ls Logo

Sungrow SH10RT User Manual

Sungrow SH10RT
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SH5.0RT/
SH6.0RT/SH8.0RT/SH10RT/
SH5.0RT-20/SH6.0RT-20/SH8.0RT-
20/SH10RT-203–Phase Hybrid
Inverter User ManualSH5.0–
10RT&SH5.0–10RT-20-UEN-Ver20-
202212
User Manual
3–Phase Hybrid Inverter
SH5.0RT/SH6.0RT/SH8.0RT/SH10RT/SH5.0RT-20/
SH6.0RT-20/SH8.0RT-20/SH10RT-20
SH5.0–10RT&SH5.0–10RT-20-UEN-Ver20-202212

Table of Contents

Other manuals for Sungrow SH10RT

Question and Answer IconNeed help?

Do you have a question about the Sungrow SH10RT and is the answer not in the manual?

Sungrow SH10RT Specifications

General IconGeneral
ModelSH10RT
CategoryInverter
Rated Power10 kW
Max. DC Input Voltage1100 V
AC Output Voltage230 V
Max. Efficiency98.4%
IP RatingIP65
Max. DC Input Power15 kW
Start Voltage180 V
Number of MPPTs2
Max. Output Current16 A
Rated Grid Frequency50/60 Hz
THDi<3%
European Efficiency98%
Max. Charging/Discharging Power10 kW
Max. Charging/Discharging Current25 A
Operating Temperature Range-25°C to +60°C
Cooling MethodNatural Convection
AC Voltage Range180 V - 280 V
Power Factor0.8 leading to 0.8 lagging

Summary

Safety Instructions

Electrical Connection Safety

Provides critical safety guidelines for electrical connections to prevent shock and damage.

Operation Safety

Lists precautions to ensure safe operation of the inverter and prevent injury or damage.

Maintenance Safety

Specifies safety procedures and precautions for performing maintenance tasks on the inverter.

Product Description

Grid-connected Parallel System

Explains how to connect multiple hybrid inverters in parallel for grid-connected operation.

Off-grid Parallel System

Describes the configuration and requirements for connecting inverters in parallel for off-grid operation.

Function Description

Safety Function

Describes integrated safety functions like short circuit protection and overvoltage protection.

Energy Conversion and Management

Explains DC to AC conversion, battery charging/discharging, and MPP tracking.

Battery Management

Outlines compatible batteries and the inverter's battery management system.

Charge Management

Details emergency and normal charge management strategies for Li-ion batteries.

Discharge Management

Explains discharge management to protect the battery from deep discharging.

Mechanical Mounting

Safety During Mounting

Outlines crucial safety precautions to be observed during the mechanical mounting process.

Location Requirements

Provides guidelines for selecting an appropriate installation location for optimal performance and safety.

Installing the Inverter

Details the step-by-step process for mounting the inverter on the wall.

Electrical Connection

Safety Instructions

Provides critical safety guidelines for all electrical connection procedures.

Terminal Description

Explains the function and location of each terminal on the inverter.

Electrical Connection Overview

Presents the system wiring diagram and lists cable requirements for connections.

External Protective Grounding Connection

Details the importance and procedures for external protective grounding.

AC Cable Connection

Connecting the AC power cable to the inverter.

AC Side Requirements

Lists requirements for AC connection, including circuit breakers and monitoring.

Assembling the AC Connector

Provides step-by-step instructions for assembling the AC connector for the inverter.

Installing the AC Connector

Guides on how to connect the assembled AC connector to the inverter.

DC Cable Connection

Provides safety and connection instructions for DC cables from PV strings.

Communication Connection

Connecting communication cables to the inverter.

Smart Energy Meter Connection

Explains how to connect the Smart Energy Meter for feed-in power limiting.

Battery Connection

Provides crucial warnings and procedures for connecting the battery to the inverter.

Connecting the Power Cable

Details connecting the power cable between the battery and the inverter.

Commissioning

Inspection Before Commissioning

Lists checks to perform before starting the inverter commissioning process.

Commissioning Procedure

Outlines the step-by-step procedure for the initial startup and commissioning of the inverter.

App Preparation

Details steps for preparing the mobile app, including installation and account registration.

Creating a Plant

Guides on creating a new plant configuration within the iSolarCloud App.

iSolarCloud App

Installing App

Explains the methods for downloading and installing the iSolarCloud App on mobile devices.

Account Registration

Guides users through the account registration process for the iSolarCloud App.

Login

Details the requirements and procedures for logging into the iSolarCloud App.

Initial Settings

Setting up initial parameters for the inverter and system.

Feed-in Limitation

Explains how to configure feed-in limitation to control power export to the grid.

System Decommissioning

Decommissioning the Inverter

Provides safety precautions and steps for safely disconnecting and removing the inverter.

Decommissioning the Battery

Outlines the steps for safely decommissioning the Li-ion battery system.

Troubleshooting and Maintenance

Troubleshooting

Lists common alarms, their IDs, and corrective measures for troubleshooting.

Maintenance

Provides important notices and guidelines for performing maintenance on the inverter.