EasyManua.ls Logo

Sungrow SH10RT - PV Energy Storage System (PV ESS)

Sungrow SH10RT
166 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
The inverter operates automatically when input and output requirements are met. Rotate the
DC switch to the “OFF” position to stop the inverter when a fault occurs. When you need to
stop the inverter normally please first turn off AC and shut down the hybrid via app.
Turn the DC switch to the “ON” position before restarting the inverter.
2.6 PV Energy Storage System (PV ESS)
When designing the system, ensure that the operating ranges of all devices that
are connected to the inverter meet the requirements of the inverter.
2.6.1 PV ESS Introduction
By directly connecting a battery module to the inverter, the conventional PV system can be
upgraded to be an Energy Storage System (ESS).
The system is capable of operating off-grid to ensure an emergency power supply for pro-
tected loads in the event of a grid interruption or blackout, which may be caused by:
islanding;
under-voltage;
under-frequency or over-frequency.
Under any connection, either grid-connection or off-grid application, please be
sure that the potential voltage between N and PE line is not higher than 30V,
otherwise, inverter will stop generating power.
The system is not suitable for supplying life-sustaining medical devices. It can-
not guarantee backup power in all circumstances.
User Manual 2 Product Description

Table of Contents

Other manuals for Sungrow SH10RT

Related product manuals