EasyManua.ls Logo

Sungrow SH10RS User Manual

Sungrow SH10RS
157 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SH8.0RS/
SH10RS/1-phase Hybrid
InverterUser ManualSH8.0-10RS-
UEN-Ver11-202212
User Manual
1-phase Hybrid Inverter
SH8.0RS/SH10RS/
SH8.0-10RS-UEN-Ver11-202212

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Sungrow SH10RS and is the answer not in the manual?

Sungrow SH10RS Specifications

General IconGeneral
ModelSH10RS
Max. Input Voltage1100 V
Start Voltage200 V
Number of MPPTs2
Rated AC Output Power10000 W
Max. AC Apparent Power11000 VA
AC Grid Frequency50 Hz / 60 Hz
Total Harmonic Distortion (THD)< 3%
DC SwitchIntegrated
Protection ClassIP65
Max Efficiency98.6%
Number of DC Inputs2
MPPT Voltage Range200 V - 1000 V
Operating Temperature Range-25 °C ~ +60 °C
CommunicationRS485, Ethernet, Wi-Fi
Max. DC Input Power11000 W
Max. AC Output Power11000 W
Cooling MethodNatural Cooling

Summary

Safety Instructions

Unpacking and Inspection

Instructions for unpacking and inspecting the inverter upon receipt.

Installation Safety

Crucial safety precautions to follow before and during inverter installation.

Electrical Connection Safety

Safety guidelines for electrical connections, including high voltage warnings.

Operation Safety

Safety rules to observe while the inverter is operating to prevent hazards.

Maintenance Safety

Safety procedures and warnings related to inverter maintenance operations.

Function Description

Energy Conversion and Management

Explanation of how the inverter converts energy and manages system operations.

Battery Management

Details on managing the connected battery system.

Mechanical Mounting

Safety During Mounting

Safety precautions to ensure a secure and safe inverter mounting process.

Electrical Connection

Safety Instructions

Essential safety guidelines for performing electrical connections.

Backup Wiring Diagram

Wiring diagrams for backup power configurations.

External Protective Grounding Connection

Instructions for connecting the external protective grounding.

AC Cable Connection

Detailed steps for connecting the AC cable to the inverter.

DC Cable Connection

Procedure for connecting DC cables from PV strings to the inverter.

Emergency Load Connection (Backup)

How to connect emergency loads to the backup port.

Battery Connection

Steps for connecting the battery to the inverter.

Commissioning

Inspection Before Commissioning

Checklist of items to verify before starting the commissioning process.

Powering on the System

Steps for powering up the inverter and the system for the first time.

App Preparation

Steps to prepare the iSolarCloud App for system commissioning.

iSolarCloud App

System Decommissioning

Decommissioning the Inverter

Steps for safely disconnecting and decommissioning the inverter.

Troubleshooting and Maintenance

Troubleshooting

Guide to identifying and resolving common faults and alarms.

Maintenance

Information on routine maintenance and safety notices.

Related product manuals