25
figure 3-1 PID Recovery Scheme
• The PID recovery function is inapplicable to N-type panel, please disable it;
• About 20W is consumed during PID recovery at night.
Keep the DC switch "ON" in the PID recovery process. During the process, there is
voltage hazard between inverter / PV module live conductors and ground. Do not
touch any of them.
3.5 Communication and Configuration
The inverter possesses various ports for device and system monitoring, including RS485,
Ethernet, WLAN, and CAN; various parameters can be configured for optimal operation.
The inverter information is accessible through the iSolarCloud App.
3.6 Import Power Limit Function
Import power means the total power purchased from grid, which includes power to charge
the battery from grid via inverter, power consumed by local loads and loads connected to in-
verter backup port from grid. Following local regulations, calculate the maximum system tol-
erable power based on the wire and circuit breaker that required by the selected model, and
the value can be set as the Import Power Limit.Import Power Limit can be set on the iSo-
larCloud App.