7 Commissioning
Proper commissioning is essential for the system to protect it against fires,
injury and electric shock.
7.1 Inspection before Commissioning
Check the following items before starting the system:
1. All the installation sites are convenient for operation, maintenance and
service.
2. Check and confirm that the inverter is firmly installed.
3. Space for ventilation is sufficient for one inverter or multiple inverters.
4. Nothing is left on the top of the inverter or battery pack.
5. The inverter and accessories are correctly connected.
6. Cables are routed in a safe place or protected against mechanical
damage.
7. The selection of the AC circuit breaker is in accordance to this manual
and all applicable local standards.
8. All unused terminals at the bottom of the inverter are properly sealed.
9. Warning signs and labels are suitably affixed and durable.
7.2 Button Introduction
The inverter offers four buttons for operation. Please refer to the following table
before any operation of the inverter.
Tab. 7-1 Button Functions
Button
Description
For navigating up or increasing the setting value.
For navigating down or decreasing the setting value.
ESC
For navigating to the left, quitting the menu or canceling the settings.
ENT
For navigating to the right or confirming a selection or settings.