EasyManua.ls Logo

Sunny SF-E905 - Step 6: Pulse Sensor and Meter Installation

Sunny SF-E905
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
We value your experience using Sunny Health and Fitness products. For assistance with parts or
troubleshooting, please contact us at support@sunnyhealthfitness.com or 1-877-90SUNNY (877-
907-8669).
STEP 6:
Connect the Pulse Sensor Wire A (No. 46a)
with Meter Wire A (No. 38a), connect the
Pulse Sensor Wire B (No. 46b) with Meter
Wire B (No. 38b), and connect Upper
Sensor Wire (No. 15) with Meter Wire C
(No. 38c). Align the slot of the Handlebar
Post (No. 9) to the bulge inside the Meter
(No. 38) then slide it onto the Handlebar
Post (No. 9) slowly.
NOTE: To avoid damaging the wires, please
push them into the Handlebar Post (No. 9)
before sliding the Meter (No. 38) onto it.
THE ASSEMBLY IS COMPLETE!

Related product manuals