EasyManua.ls Logo

SUNSTONE ruby series - Initial Grill Setup; First-Time Startup Checklist

SUNSTONE ruby series
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
START-UP
CHECKLIST
Caution: Never operate the grill unattended.
FIRST TIME STARTUP CHECKLIST
The burner is free of any debris or obstruction.
Installation of the proper gas type and regulator settings.
The proper gas connection is complete.
Minimum clearances are maintained.
All packaging has been removed.
All parts and components are properly in installed.
An installer-supplied manual gas shut-off valve is fully
accessible.
LP hose is clean and inspected for cuts, wear, abrasion,
or leaks. Replace if necessary with a suitable UL, ETL or CSA
Listed part with internally threaded connector.

Related product manuals