Page | 9 Hybrid Inverter | Installer Manual
3. INSTALLATION GUIDE
Start
END
Check Before
Installation
Prepare
Installation Tools
Determine The
Installation Position
Electrical
Connection
Install Wall
Bracket
Install Battery
3.1. Checking Before Installation
3.1.1. Checking Outer Packing Materials
Packing materials and components may be damaged during transportation. Therefore, check
the outer packing materials before installing the battery. Checking the surface of packing mate-
rials for damage, such as holes and cracks. If any damage is found, do not unpack the battery
and contact the dealer as soon as possible. You are advised to remove the packing materials
within 24 hours before installing the battery.
3.1.2. Checking Deliverables
After unpacking the battery, check whether deliverables are intact and complete. If any damage
is found or any component is missed, contact the dealer.
The below table shows the components and mechanical parts that should be delivered.
Carton
Hanging bracket
1 Hanging bracket
2W all bracket
Pearl wool
Battery
Pearl wool