•Examples
•
When applied to heat-exchange, install a
pressure gauge at the outlet to ensure no
blockage in the pipeline.
•
A strainer should be installed at the inlet to
revent solids from being sucked in.
•
Install valves at the inlet and the outlet for easy
maintenance.
•
Strainer mesh should be dia. 5~7mm and total
mesh area is 5 times the pipe area or more.
•
•
For monitoring the ow and possible blockage,
install a pressure gauge at the outlet.
•
Install a dry-run control system to prevent
damage to the pump.
•
Remove trash blocked in the pump periodically.
•
Clean the strainer mesh periodically.
•
Strainer mesh should be dia. 5~7mm and total
mesh area is 5 times the pipe area or more.
•
Install valves at the inlet and the outlet for easy
maintenance.
•
•
When applied to scrubber, water tank should
be large enough and over 80cm in depth of
water.
•
Lower the pump head as much as possible and
enlarge the total mesh area of strainer.
•
The strainer should be wasy to disassemble
for cleaning. The Strainer mesh should be dia.
5~7mm.
•
Keeping the water suddicient all the time to
prevent from dry running..
•
Install a dry-run control system to prevent
damage to the pump.
•
Install a motor shield to protect the motor for
outdoors application.