13
•
When applied to tank,
Install a valve at the inlet for easy maintenance.
•
Monitoring the level in the tank to prevent from dry running.
•
For SD pump, check valve(part no.14) without check lid is
recommended.
•
Install Check valve if the discharge pipeline is over 8M high.
•
Fix the pipeline.
•
Install a motor shield to protect the motor for outdoors application.
•
•
A strainer should be installed at the inlet to revent solids from being
sucked in.
•
Keep the level over the strainer for 30cm or more to prevent air from
being sucked in.
•
Install Check valve if the discharge pipeline is over 8M high.
•
Install a dry-run control system to prevent damage to the pump.
•
Install valve at the outlet and the outlet for easy maintenance.
•
Self-priming tank is recommended for pumps with 3" in/outlet.