EasyManua.ls Logo

Suzuki GSF600Y 2000 - Page 83

Suzuki GSF600Y 2000
380 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE 3-45
After removing the spring holder bolt 1 and spring, unlock the
ratchet mechanism 2 and push the push rod 3 all the way
into the cam chain tensioner.
NOTE:
Before installing the cam chain tensioner, turn the crankshaft clock-
wise to remove any cam chain slack between the crankshaft
sprocket and exhaust camshaft sprocket.
Install a new gasket and the cam chain tensioner onto the cyl-
inder block as shown.
Tighten the cam chain tensioner bolts to the specified torque.
""
""
" Cam chain tensioner mounting bolt:
7 N
.
m (0.7 kgf
.
m, 5.0 lb-ft)
Insert the spring into the cam chain tensioner and tighten the
spring holder bolt 4 to the specified torque.
" Spring holder bolt: 35 N
.
m (3.5 kgf
.
m, 25.5 lb-ft)
$
After installing the cam chain tensioner, check the cam
chain slack to make sure that the cam chain tensioner is
working properly.
Recheck the camshaft position (cam timing).
Install the cam chain guide 5 with the four bolts and tighten
them to the specified torque.
" Cam chain guide mounting bolt:
10 N
.
m (1.0 kgf
.
m, 7.0 lb-ft)
NOTE:
Be sure to face the arrow mark on the cam chain guide towards
the exhaust side.

Table of Contents

Related product manuals