Multi Head E,K Report
Order
1
Check List of Environment before instalation
Status of machine before it arrived at your company
Start from Wood box Opening
When you arrived,machine was movin
to inside of factor
Arrived during installation Arrived during assembly (which setp: )
After whole procudre etc, ( )
(1) Temperature/ humidity,ambience good bad
(2) The number of layers :
(3) Material of bottom :
(4) Levelness of floor good bad
(5) Speculation of voltage :
(6) Input 1P ( V )
Voltage : 3P (R↔S : V ) (R↔T : V ) (S↔T : V )
2
Check List for installation and exterior
(1) Safe Arrival
- When arrived, check the levelness of of machine good bad
- Adjust levelness with Bolt and check (if it is not correct at first) good bad
(2) Check status of frame and debris
- Check status of frame at first site good bad
- Check debris or not good bad
3
Check list for movement TEST and Running TEST
After safe arrival,test movement of machine
(1) JUMP TEST good bad
(2) WIPER TEST good bad
(3) PICKER TEST good bad
(4) TRIM TEST good bad
(5) THREAD SENSING TEST good bad
Model
Agent Serial No.
List
Version Date
Date Technician
Country
Company
Page 16 Of 17 (주)SUNSTAR SWF C/S Center