EasyManua.ls Logo

Tanaka AD-6 User Manual

Tanaka AD-6
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Automated Distillation Tester
Model: AD-6
Instruction Manual
Ver 3.01 100105
Read this manual thoroughly before using the product,
and store in a safe place for future reference.
TANAKA SCIENTIFIC LTD, TOKYO, JAPAN

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Tanaka AD-6 and is the answer not in the manual?

Tanaka AD-6 Specifications

General IconGeneral
BrandTanaka
ModelAD-6
CategoryTest Equipment
LanguageEnglish

Summary

WARNINGS AND CAUTIONS FOR SAFE USE

Installation Environment

Details safety requirements for installing the tester in a well-ventilated area on a stable table.

Electric Connection

Provides safety instructions for handling power cables and electrical connections.

Handling Precautions

Outlines precautions for handling samples, flasks, and hot items to prevent accidents.

Operational Precautions

Details safety measures for operating the tester, including avoiding hot parts and unattended operation.

Repairs, Alterations and Maintenance

Stresses that only authorized personnel should perform repairs or alterations to the tester.

Section Names and Functions

Key Safety Components

Identifies critical safety features like the fire containment shutter and nitrogen inlet.

Installation

Installation Site

Specifies requirements for a well-ventilated, stable location, avoiding direct sunlight and dust.

Setting of Fire Containment Shutter

Instructions for setting the fire containment shutter.

Electrical Connections

Details crucial safety instructions for connecting power cables and ensuring proper grounding.

Nitrogen Gas Connection (for fire containment)

Explains how to connect the nitrogen gas piping for fire containment.

Supplying Circulating Solution

Provides instructions for checking and replenishing the circulating solution.

Routine Daily Inspection

Prior to Testing

Starting the Tester

Instructions on powering on the unit and navigating the initial STANDBY screen.

Setting a Sample

Details how to measure and transfer the sample, add boiling chips, and attach the sensor.

Starting a Test

Starting a Test

Details the procedure for initiating a distillation test using the START key.

Terminating a Test

Termination and Dry Point (D.P CUT)

Describes methods for ending a test at the dry point, manually or automatically.

Setting Test Parameters

Manual Heater Control

Maintenance

Fire Containment Shutter

Procedure for testing and confirming the operation of the fire containment shutter.

Error Status and Fault

Describes how errors are displayed, printed, and what actions to take.

Inspection and Post-sale Service

Troubleshooting

Provides warnings and instructions for diagnosing and resolving tester issues.

Specifications

Dry point and Safety features

Covers manual dry point detection and activation of safety/fire alarm functions.

Related product manuals