EasyManua.ls Logo

tau ARM200 Series - User Manual

tau ARM200 Series
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
1
ARM200 Series
Edizione 01 - anno 2007 rev. 12 - del 02/12/2009http://www.tauitalia.com
Serie ARM200
AUTOMAZIONI PER CANCELLO A BATTENTE
AUTOMATISIERUNG VON FLÜGELTOREN
AUTOMATIC SYSTEMS FOR SWING GATES
AUTOMATISATIONS POUR PORTAIL À BATTANT
SISTEMA DE AUTOMATIZACIÓN PARA VERJAS CON BATIENTES
>ITALIANO
>ENGLISH
>DEUTSCH
>FRANÇAIS
>ESPAÑOL
T AU srl via E. Fermi, 43 36066 Sandrigo (Vi) Italy Tel. +390444750190 Fax. +390444750376 E-mail: info@tauitalia.com
MANUALE D’USO E MANUTENZIONE
USE AND MAINTENANCE MANUAL
BEDIENUNGS - UND WARTUNGSANLEITUNG
MANUEL D’EMPLOI ET D’ENTRETIEN
MANUAL DE USO Y MANTENIMIENTO

Other manuals for tau ARM200 Series

Question and Answer IconNeed help?

Do you have a question about the tau ARM200 Series and is the answer not in the manual?

Summary

IMPORTANT NOTICE FOR THE INSTALLER

GENERAL SAFETY REGULATIONS

Key safety rules for installers, covering product use, handling, and installation compliance.

DESCRIPTION

ACTUATOR PARTS (fig.1)

Details and identification of the main components of the actuator unit.

DIMENSIONS (fig.2)

Provides the physical dimensions of the actuator unit.

INSTALLATION (fig.3)

Electrical set-up (standard system - ARM200)

Wiring diagram and cable specifications for the standard ARM200 system.

Electrical set-up (standard system - ARM200 BENC)

Wiring diagram and cable specifications for the ARM200BENC system.

WIRING THE ACTUATOR

ARM200 - 230 Vac Wiring

Wiring details for the ARM200 230 Vac model, including terminal connections.

ARM200 BENC - 12 Vdc Wiring

Wiring details for the ARM200BENC 12 Vdc model, including terminal connections.

START-UP

TESTING THE AUTOMATED SYSTEM

MANUAL RELEASE

RESTORING NORMAL OPERATION

USE

MAINTENANCE

Routine maintenance

Schedule and tasks for regular maintenance of the gate and automation system.

Extraordinary maintenance or breakage

Procedures for handling major repairs or component failures.

SPECIAL APPLICATIONS

NOISE LEVELS

INSTRUCTIONS AND WARNINGS FOR AUTOMATIC SYSTEM USERS

DESCRIPTION

Explains the ARM200 swing gate automation system, its features, and irreversible nature.

MANUAL RELEASE

Procedure for manual operation in case of power failure or malfunction.

MAINTENANCE

Guidance on routine and extraordinary maintenance for the automation system.

PROGRAMMED MAINTENANCE SCHEDULE: Six-monthly Checks

Connection and efficiency of safety circuit breaker

Checks the connection and function of the safety circuit breaker.

Setting and correct operation of electronic clutch

Verifies the setting and proper functioning of the electronic clutch.

Connections and operation of safety devices

Checks the connection and operation of safety devices.

Connection and efficiency of earth socket

Verifies the connection and efficiency of the earth socket.

PROGRAMMED MAINTENANCE SCHEDULE: Six-monthly Checks

Operation of manual release device

Checks the function of the manual release device.

Operation of limit switches (if any)

Checks the operation of limit switches.

Connections and operation of accessories

Checks the connection and operation of accessories.

Gearmotor fixing condition

Assesses the condition of the gearmotor's fixing.

PROGRAMMED MAINTENANCE SCHEDULE: Six-monthly Checks

Fastening pins conditions

Checks the condition of the fastening pins.

Wear of front; rear fitting

Assesses the wear of the front and rear fittings.

Gate general conditions

Evaluates the overall condition of the gate.

Fitters signature

Space for the fitter to sign off on maintenance checks.

Users signature

Space for the user to acknowledge maintenance completion.

EXPLODED VIEWS AND SPARE PARTS LIST

ARM225 - ARM250 - ARM270 (230 Vac) Parts

List of spare parts for the ARM200 series 230 Vac models.

ARM225 BENC - ARM250 BENC - ARM270 BENC (12 Vdc) Parts

List of spare parts for the ARM200BENC series 12 Vdc models.

DECLARATION OF CONFORMITY

TAU Guarantee: General Conditions

TAU Guarantee Certificate

Summary

IMPORTANT NOTICE FOR THE INSTALLER

GENERAL SAFETY REGULATIONS

Key safety rules for installers, covering product use, handling, and installation compliance.

DESCRIPTION

ACTUATOR PARTS (fig.1)

Details and identification of the main components of the actuator unit.

DIMENSIONS (fig.2)

Provides the physical dimensions of the actuator unit.

INSTALLATION (fig.3)

Electrical set-up (standard system - ARM200)

Wiring diagram and cable specifications for the standard ARM200 system.

Electrical set-up (standard system - ARM200 BENC)

Wiring diagram and cable specifications for the ARM200BENC system.

WIRING THE ACTUATOR

ARM200 - 230 Vac Wiring

Wiring details for the ARM200 230 Vac model, including terminal connections.

ARM200 BENC - 12 Vdc Wiring

Wiring details for the ARM200BENC 12 Vdc model, including terminal connections.

START-UP

TESTING THE AUTOMATED SYSTEM

MANUAL RELEASE

RESTORING NORMAL OPERATION

USE

MAINTENANCE

Routine maintenance

Schedule and tasks for regular maintenance of the gate and automation system.

Extraordinary maintenance or breakage

Procedures for handling major repairs or component failures.

SPECIAL APPLICATIONS

NOISE LEVELS

INSTRUCTIONS AND WARNINGS FOR AUTOMATIC SYSTEM USERS

DESCRIPTION

Explains the ARM200 swing gate automation system, its features, and irreversible nature.

MANUAL RELEASE

Procedure for manual operation in case of power failure or malfunction.

MAINTENANCE

Guidance on routine and extraordinary maintenance for the automation system.

PROGRAMMED MAINTENANCE SCHEDULE: Six-monthly Checks

Connection and efficiency of safety circuit breaker

Checks the connection and function of the safety circuit breaker.

Setting and correct operation of electronic clutch

Verifies the setting and proper functioning of the electronic clutch.

Connections and operation of safety devices

Checks the connection and operation of safety devices.

Connection and efficiency of earth socket

Verifies the connection and efficiency of the earth socket.

PROGRAMMED MAINTENANCE SCHEDULE: Six-monthly Checks

Operation of manual release device

Checks the function of the manual release device.

Operation of limit switches (if any)

Checks the operation of limit switches.

Connections and operation of accessories

Checks the connection and operation of accessories.

Gearmotor fixing condition

Assesses the condition of the gearmotor's fixing.

PROGRAMMED MAINTENANCE SCHEDULE: Six-monthly Checks

Fastening pins conditions

Checks the condition of the fastening pins.

Wear of front; rear fitting

Assesses the wear of the front and rear fittings.

Gate general conditions

Evaluates the overall condition of the gate.

Fitters signature

Space for the fitter to sign off on maintenance checks.

Users signature

Space for the user to acknowledge maintenance completion.

EXPLODED VIEWS AND SPARE PARTS LIST

ARM225 - ARM250 - ARM270 (230 Vac) Parts

List of spare parts for the ARM200 series 230 Vac models.

ARM225 BENC - ARM250 BENC - ARM270 BENC (12 Vdc) Parts

List of spare parts for the ARM200BENC series 12 Vdc models.

DECLARATION OF CONFORMITY

TAU Guarantee: General Conditions

TAU Guarantee Certificate

tau ARM200 Series Specifications

General IconGeneral
Motor voltage24V DC
Max motor power200W
Operating temperature-20°C to +55°C
Protection classIP44
Limit switch inputYes
Encoder inputYes
Power200W
Maximum Gate Weight400 kg
Maximum Gate Width4 m
Protection RatingIP44

Related product manuals