6-6
OPERATING PROCEDURES
Models RD30/RC25
Operating Procedures
6
3. If the sanitizing solution does not continue to flow
after releasing the prime button, press and hold the
prime button for an additional 10 seconds. Repeat
this procedure as required to prime the post mix
valve.
Figure 6-25
4. Drain the sanitizing solution from the freezing
cylinder and repeat this procedure until all the
sanitizing solution is dispensed from the mix delivery
container. Disconnect the mix delivery container.
Figure 6-26
Important! The machine must not be placed in Auto
mode until all sanitizing solution has been removed
from the freezing cylinder and proper priming
procedures have been completed. Failure to follow
this instruction may result in damage to the freezing
cylinder.
Dispenser
1. Prepare a pail of approved 100 ppm sanitizing
solution (examples: 2-1/2 gal. [9.5 L] of Kay-5
®
or 2
gal. [7.6 L] of Stera-Sheen
®
). Use warm water and
follow the manufacturer’s specifications. Remove the
upper rear cover, and open the hopper cover. Pour
the sanitizing solution into the hopper and allow the
solution to flow into the freezing cylinder.
Figure 6-27
2. Once the mix float switch is submerged in the
sanitizing solution, brush-clean the mix hopper, mix
inlet hole, and mix-level float switch.
Figure 6-28

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Taylor RD25 and is the answer not in the manual?

Taylor RD25 Specifications

General IconGeneral
BrandTaylor
ModelRD25
CategoryBeverage Dispenser
LanguageEnglish

Related product manuals