EasyManua.ls Logo

TECO TK 2000 - Step 1: Safety and Initial Disassembly

TECO TK 2000
10 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EQUIPMENT AND
INITIAL STEP
www.tecoonline.com | www.tecous.com
EQUIPMENT
- Big Crosshead Screwdriver
- Small Crosshead Screwdriver
SPARE PARTS
- Heater KRES02# (spare part)
- Nylon washer 3.5.038
- Ring nut 2.4.124
INITIAL STEP
- Turn OFF the chiller and let it OFF for twenty minutes before
proceeding
- Disconnect the chiller from power supply
- Never touch internal part or dismount chiller when it is connected to
power supply to avoid potential electric shock.
- Disconnect chiller from water pipe, by using squeeze tube clamps
and let some water flow away from chiller exchanger.
HEATER NYLON WASHER RING NUT

Other manuals for TECO TK 2000

Related product manuals