PREPARATION FOR USE AND INSTALLATION
SECTION 2
PREPARATION FOR USE AND INSTALLATION
2.1 Unpacking and Inspection
Upon receipt, the R1L-E2A and its accessory kit should be
carefully unpacked and removed from the shipping container.
Separate the units from the packing material and inspect the
instrument for any external damage.
If any dents, broken, or loose parts are seen, do not use the
equipment. Notify TEGAM immediately.
Note that the instrument is shipped with its batteries
removed. Unwrap the three D-cells which were shipped with
the unit.
Release the two latches which secure the lid of the Model R1L-
E2A Microohmmeter and open the lid. Since the lid is well
gasketed, it may be difficult to open if there is an appreciable
difference between external and internal air pressure. Check
for the presence of two test probes stored in the cavity in the
lid. If the test probes or instruction manual are not present,
and the instrument is new, report this immediately to TEGAM.
2.2 Operational Warnings and Considerations Prior to Use
(This section, Operational Warnings and Considerations
Prior to Use, is controlled and may only be changed with
approval of the Notified Body.)
2.2.1 Batteries
Use only Alkaline or Manganese D Cells that have been proven
by a Nationally Recognized Testing Laboratory to meet the
requirements of UL60079-11, section 10.5.2. Use of any other
battery will invalidate the Type certificate and will create a
hazardous condition. The only batteries that TEGAM has
secured such testing on, and which are approved for use in the