EasyManua.ls Logo

Teikoku ALP 0104QM - User Manual

Teikoku ALP 0104QM
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTRUCTION MANUAL
for Installation, Operation, and Maintenance
HE-12270 December 2019
ALP
TM
ADVANCED LOW-PROBABILITY
AMMONIA TRANSFER PUMP
TYPE-F (Plan 1-SD)
0104QM Multi-Stage Pressurized Circulation Pump

Table of Contents

Questions and Answers

Summary

Introduction to Teikoku Chempump

Understanding Safety Terms

Explains safety symbols and terms like Attention, Caution, and Hazard used in the manual.

Applicable Standards and Regulations

Lists industry standards (JIS, ASME, CSA, IIAR) that the pump conforms to.

Product Warranty Period

Specifies the warranty duration for the product, typically two years from delivery.

Intellectual Property Rights

Outlines intellectual property rights and usage restrictions for the product and manual.

Safety Warnings for Teikoku Chempump

Warning: Do Not Run Dry

Warns against operating the pump without liquid to prevent damage to bearings and motor.

Warning: Avoid Rapid Temperature Changes

Advises against sudden temperature fluctuations to prevent gasket leaks.

Caution: Hot Surfaces

Alerts users that the motor and pump can be hot to touch, even with cold liquids.

Warning: Restarting After Motor Trips

Instructs not to restart the motor after tripping without diagnosing the cause of failure.

Hazard: Do Not Remove Bolts

Warns against removing pump/motor bolts without de-pressurizing and decontaminating.

Hazard: Residual Liquid Present

Emphasizes the presence of residual liquid and necessary precautions for safety.

General Information on Teikoku Pumps

General Design and Operation

Describes the integrated pump-motor unit, secondary containment, and circulation system.

Stator Assembly Details

Details the construction and secondary containment features of the stator.

Rotor Assembly Description

Explains the construction and materials of the pump's rotor assembly.

Liquid Film Journal Bearings

Describes the carbon graphite bearings and their lubrication system.

Thrust Collars and Shaft Sleeves

Describes these components, their material, and function in axial load handling.

Internal Cooling Flow Path

Explains the fluid path for motor cooling and bearing lubrication.

Automatic Thrust Balance Mechanism

Details the system for balancing hydraulic thrust on the impeller.

NH3 Transfer System Requirements

Refers to system requirements for anhydrous ammonia transfer applications.

Pump Installation Guide

Receipt Inspection Procedures

Procedures for inspecting the pump and its packaging upon arrival.

Storage Recommendations

Guidelines for storing the pump before installation to prevent moisture ingress.

Structural and Piping Alignment

Proper support and alignment for the pump and associated piping.

Pump Location Considerations

Guidance on selecting an optimal location for the pump for efficient operation.

Mounting and Alignment Instructions

Instructions for mounting the pump and ensuring proper alignment.

Piping Data and Recommendations

Best practices for suction and discharge piping installation, including elbows and reducers.

TRG Bearing Wear Monitor

Explanation of the Teikoku Rotary Guardian (TRG) bearing wear monitor and its operation.

Optional Inverter Operation

How to operate the pump using an optional variable frequency drive (VFD).

Optional Rotor Cavity Thermowell

Details on the optional temperature sensor assembly for monitoring rotor cavity temperature.

Pump Operation Procedures

Procedure Before Initial Start

Pre-start checks to ensure the pump and piping are clear and ready for operation.

Preparation and Trial Operation

Steps for preparing the pump for its first operation, including protective devices.

Setting Thermal Overload Protection

Guidance on setting the thermal overload protective device based on rated current.

Priming and Venting Procedure

Essential steps to prime and vent the pump correctly to prevent vapor lock and bearing failure.

Rotation Check (TRC-1)

How to verify the motor's direction of rotation using the Teikoku TRC-1 indicator.

Starting Procedure

Step-by-step instructions for safely starting the pump after priming and venting.

Operation Details and Monitoring

Ongoing operational checks, monitoring of TRG meter, and troubleshooting advice.

Shutdown Procedure

Safe steps for shutting down the pump, including de-energizing and venting.

Pump Maintenance and Servicing

Recommended Tools for Maintenance

List of tools required for disassembly, reassembly, and inspection of the pump.

Disassembly Instructions

Detailed steps for taking the pump apart for servicing, including safety precautions.

Component Inspection Guide

Procedures for inspecting bearings, shafts, rotor, stator, and other critical components.

Reassembly Process

Steps to reassemble the pump after inspection or repair, including gap adjustments.

Service Policy for Returns

Teikoku USA's policy for returning pumps or components for repair or evaluation.

Spare Parts Ordering Information

Guidance on identifying and ordering replacement parts, including required serial numbers.

Appendix: Supporting Documentation

Motor Pump Data Sheet

Provides detailed specifications for the pump and motor, including operating conditions and materials.

Outline Drawing F-210 P-0104 Q

Shows dimensional drawings, connection points, and overall layout of the pump.

Sectional View with Part Numbers

Detailed cross-section illustrating pump components and their identification numbers.

Type-F Installation Instructions

Specific recommendations for piping and vent system installation for Type-F pumps.

Troubleshooting Guide

Common pump issues, probable causes, and suggested solutions for efficient problem-solving.

TRC-1 Rotation Checker Information

Information and usage guide for the hand-held Teikoku Rotary Checker (TRC-1).

NH3 Performance Curve (20°F)

Performance curves (head, efficiency, power, NPSHr) for Ammonia at 20°F.

NH3 Performance Curve (-50°F)

Performance curves (head, efficiency, power, NPSHr) for Ammonia at -50°F.

Type 217-120 Motor Data Sheet

Detailed technical data and output characteristics for the Type 217-120 motor.

Temperature;Pressure Profile

Data on critical points temperature and pressure within the 1-SD pump.

Rotor Cavity Thermowell Details

Information and recommendations for the optional temperature sensor assembly.

Terminal Box Assembly Diagram

Diagram and parts list for the pump's terminal box assembly.

Allowable Piping Forces and Moments

Table specifying acceptable piping loads on the pump suction and discharge nozzles.

Speed Control Panel Layout

Shows the physical layout of the optional TSG NH3 Speed Control Panel.

Speed Control Panel Wiring Diagram

Wiring diagram for the optional TSG NH3 Speed Control Panel.

Decontamination Form

Form to document decontamination procedures for returned pumps or parts.

Pump Repair Policy

Teikoku USA's policy for handling pump returns for repair, including required documentation.

Teikoku ALP 0104QM Specifications

General IconGeneral
BrandTeikoku
ModelALP 0104QM
CategoryWater Pump
LanguageEnglish

Related product manuals