Do you have a question about the Tekmar Boiler Control 265 and is the answer not in the manual?
Explains how boiler target temperature is determined by various inputs and settings.
Explains how supply water temperature is varied by outdoor temperature.
Explains how DHW demand triggers operation and sets target temperature.
Outlines different DHW modes and priority settings for tank recovery.
Explains setpoint demand and how it affects the target temperature.
Covers different setpoint modes, including priority and conditional priority.
Details how to connect and configure external input signals (0-10V, 2-10V).
Explains the conditions under which the primary pump operates.
Highlights safety warnings and checks before beginning installation.
Details the steps for mounting the control base and initial wiring.
Explains connections for power supply, boiler, DHW, setpoint, and external inputs.
Procedures for testing sensors and the main power supply.
Describes how to test boiler, DHW, setpoint, and external inputs.
Procedures for testing the primary pump and C.A./Alert outputs.
Describes how to test boiler enable, DHW pump/valve, and boiler pump outputs.
Selects between combustion air damper or alert device function.
Enables pump exercising to prevent seizing during inactivity.
Selects parallel or sequential modulation for multiple boilers.
Step-by-step guide to testing control functions and outputs.
Details errors related to outdoor, supply, and return sensors.
Covers boiler alert errors and general memory/configuration errors.
Explains how boiler target temperature is determined by various inputs and settings.
Explains how supply water temperature is varied by outdoor temperature.
Explains how DHW demand triggers operation and sets target temperature.
Outlines different DHW modes and priority settings for tank recovery.
Explains setpoint demand and how it affects the target temperature.
Covers different setpoint modes, including priority and conditional priority.
Details how to connect and configure external input signals (0-10V, 2-10V).
Explains the conditions under which the primary pump operates.
Highlights safety warnings and checks before beginning installation.
Details the steps for mounting the control base and initial wiring.
Explains connections for power supply, boiler, DHW, setpoint, and external inputs.
Procedures for testing sensors and the main power supply.
Describes how to test boiler, DHW, setpoint, and external inputs.
Procedures for testing the primary pump and C.A./Alert outputs.
Describes how to test boiler enable, DHW pump/valve, and boiler pump outputs.
Selects between combustion air damper or alert device function.
Enables pump exercising to prevent seizing during inactivity.
Selects parallel or sequential modulation for multiple boilers.
Step-by-step guide to testing control functions and outputs.
Details errors related to outdoor, supply, and return sensors.
Covers boiler alert errors and general memory/configuration errors.
| Control Type | Boiler Control |
|---|---|
| Display Type | LCD |
| Control Outputs | Relay |
| DHW Priority | Yes |
| Outdoor Reset | Yes |
| Enclosure Rating | NEMA 1 |
| Sensor Type | NTC Thermistor |
| Boiler Type | Modulating or Single Stage |
| Supply Water Temperature Sensor | 10K Thermistor |
| Outdoor Temperature Sensor | 10K Thermistor |
| DHW Temperature Sensor | 10K Thermistor |
| Number of Stages | 2 |
Loading...