Do you have a question about the TekTone Tek-CARE NC110 and is the answer not in the manual?
Communication | Wired |
---|---|
Power Supply | 24 VDC |
Model | NC110 |
Voltage | 24 VDC |
Compatibility | Tek-CARE System |
Operating Temperature | 0° to 50°C (32° to 122°F) |
How to operate the NC110N Master Station, including call handling and controls.
Operating instructions for the NC110A Master Station, including volume and labeling.
Operating procedures for various Tek-CARE call stations, including calling and canceling.
Operating procedures for SF101C and SF101N call stations, including call and cancel functions.
Operating instructions for emergency and code stations, covering call initiation and cancellation.
How to operate LI150B and LI150N Duty Stations, including call indication and tone silencing.
Understanding corridor light indications for emergency and normal calls from LI382LED and LI381.
Interpreting zone light indicators for normal and emergency calls on LI382LED and LI382 Zone Lights.
Explanation of how PK152 and PK151A Power & Control Units function within the system.
Description of the PK800A Secondary Power Supply and its role in the system.
Components and basic function of the NC110N Master Station within the system.
Overview of the NC110A Master Station design and its operating principle.
Operating principles of various call stations, including normal call initiation and cancellation.
Operating principles for emergency and code stations, including emergency call signaling.
Step-by-step guide for installing the Tek-CARE NC110 system components.
Recommended placement guidelines for master stations, call stations, and lights.
Instructions and considerations for running conduit and wiring for system components.
Details on wiring specific station types, including master stations and call stations.
Guidance on installing housings for master stations and call/emergency stations.
Procedures for checking wiring for shorts and grounds before powering the system.
Recommended methods for making wire connections for various system components.
Steps to recheck all wire connections for satisfactory completion.
Pre-test procedures to set all stations to normal operating conditions.
Procedures for testing system functionality by initiating calls from various stations.
Maintenance procedures for NC110A Master Stations, including cleaning the membrane switch.
Replacing selector lamp lenses and filters on NC110N Master Stations.
Information on user serviceability for PK152 and PK151A Power & Control Units.
Information on user serviceability for the PK153 Third Priority Control Unit.
User serviceable parts and fuse replacement for the PK800A Secondary Power Supply.
Procedure for replacing the 4A fast-blow fuse in the 4A Fast-Blow Fuse Assembly.
Replacing call cords on SF100, SF102, SF100N, SF100/2 call stations.
Information on user serviceability for SF101C and SF101N Call Stations.
Information on user serviceability for SF155B, SF339, SF151N, SF153N, SF156B stations.
Information on user serviceability for LI150B and LI150N Duty Stations.
Replacing bulbs and covers for LI381 Corridor and LI382 Zone Lights.
List of available replacement parts with part numbers and their uses.