Do you have a question about the TES Series and is the answer not in the manual?
Application | Industrial, Commercial |
---|---|
Fuel Type | Natural Gas, Diesel, Heavy Oil |
Control System | PLC Based |
Installation Type | Floor Standing |
Thermal Efficiency | ≥98% |
Calculate boiler room volume and appliance input to determine confined or unconfined space for ventilation.
Ensure adequate fresh air supply through permanent openings for confined spaces or tight construction.
Inspect door insulation and combustion chamber liner, then connect piping to the heating system.
Details on system bypass, refrigeration systems, low water cutoff, and oxygen contamination.
Vent the boiler using a fireclay tile-lined chimney or compliant factory-built chimney.
Adhere to National Electrical Code and local regulations for wiring and circuit protection.