EasyManua.ls Logo

Textron Cessna 208B - TKS Tank Installation; Filler and Vent Tubing Installation

Textron Cessna 208B
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICE KIT
SK 208-179B
4. Install th e TKS tank as follows:
A. (Refer to Figure 8) With 16 A N525-832R7 Screws and 16 NAS1149N832P Washers, install the tank
to the nut-plates that you installed on the belly of the airplane.
B. (Refer to Figure 14, View G-G and View H-H.) Install the 13146-05 LP Tank Wire Harness to the
TKS t ank .
C. Bon d and attach th e ground wires on the 13146-05 LP Tank Wire Harness to the lower inboard
mount screws on Auxiliary Pump 1 and Auxiliary Pump 2.
D. Atta ch the strap as s emblies around the tank and do not tight en at t his time.
E. (Refer to Fi gure 11, View E-E and View F-F.) Inside the airplane, tighten the 14 fasteners for the
forward and the aft TKS tank strap as s emblies.
F. On the straps assemblies under t he tank, torque the two self locking n uts t o 20 inch-pounds.
5. Install and connect the filler tubing and the v ent tubing as follows:
A. (Refer to Figure 20 , Detail A and View A-A.) P ut the S1053 K1 0W Du ct in po sition in the ai r plane
belly with the ZCT-TS-080 Tubing install ed on it at the two ends.
(1) Cut the ZCT -TS -080 Tubing down one side to make it fit on to the S1053K10W Duct .
NOTE: The inside d iameter of the ZCT - TS-080 is the same as the outside diameter of the
S1053K10W Duct .
(2) Attach th e ZCT-TS-080 Tu bing to the S105 3K 10W Du ct with S220 9-1 Ties.
B. Wrap P 840154 Tape around the part of the S1053K10W Duct that is adjacent to the filler port
where you will install the S1891-20S Clamp.
C. Atta ch the S 1053K10W Duct to t he filler port wi th the S1891-20S Clamp.
D. Do the routing of the S1053K10W Duc t toward the TKS tank.
E. (Refer t o Fig ure 20, View D-D, View G-G, and View H -H. ) W ith three S2209-1 Ties, attach the
S1053K10W Duc t to the structure at the three S2034-1 Mounts.
F. Use S2209-1 Ties to attach the S 1053K 10W Duct to the structure as neces s ary to make sure that
the duct doe s not t ouc h or cause inte rference with the structure or the cont rol cables.
G. (Refer to Figure 20, View B-B, View C-C, and View D-D.) Install three MS21919WDG22 Clamps
and three MS27039-1-08 Screws.
H. (Re fer to Figure 20, View E-E) Install one MS21919WDG26 Clamp and one MS27039-1-08 Screw.
I. (Refer to Figure 20, Detail A.) Wrap P 840154 Tape around the part of the S1053K10W Duct that is
adjacent t o the TKS tank where you will install the S1891-20S C lamp.
J. Attach the S 1053K10W Duct to t he TKS tank with the S1891-20S Clamp.
K. Attach t he S149 5-6 Hose to the filler port vent with the S2357-1 Clamp.
L. Do the routing of th e S 1495-6 H ose forward.
M. (Refer to Figure 19, D et ail A .) W ith the S3017-6-6-6 Tee an d three S2357-1 C lam ps , at tach the end
of the S1495-6 Hos e to t he two S 1495-6 H os es that attach to the tank .
N. With two S 2357-1 Clamps, attach the t wo S1495-6 Hoses to t he structure.
O. (Re fer t o F igure 19, View A -A, View B-B, View C-C, View D-D, View E-E , View F - F, View G-G, View
H-H, and View J-J.) With the four S2209-1 Ties , attach the S1495-6 Hoses to the structure at
the four S2034-1 M ounts.
6. (Refer to Figure 17, View B-B.) Install the bulkhead connectors on the airplane belly as follows:
A. In th e 0.87-i nc h diam eter hole that you m ade in the airplane belly, install the MN62 16 Bulkhead
Unequal Tee, two MN6211 Backnut s , and MN6782 5/16 Blanking Cap As se mbl y.
SK208-179B
February 7, 2013 Page 21

Other manuals for Textron Cessna 208B

Related product manuals