Do you have a question about the Textron Cessna 208B and is the answer not in the manual?
Specifies the installation of the Low-Profile TKS Ice Protection System.
Lists the aircraft models and serial number ranges applicable to the kit.
Explains the function of the TKS Ice Protection System installation.
Confirms that FAA approval has been obtained for the technical data.
Lists the associated reference document or revision.
Provides estimated weight increase, arm, and resultant moment figures.
Lists all parts required for the installation of the TKS Ice Protection System.
Outlines initial steps before commencing the installation work.
Emphasizes using eye protection and proper handling of TKS fluid.
Details safe disposal of fluid and preventing system contamination.
Lists approved materials for cleaning porous panels.
Provides instructions and cautions for installing nylon tubing and fittings.
Describes the process of clenching the olive to the nylon tubing using specified tools.
Details how to assemble tube couplings, including sealing rings and nuts.
Instructions for drilling drain holes and installing grommets in the tailcone.
Describes installing doublers for transponder antenna support.
Details the installation of doublers for the TKS fairing tank on the airplane structure.
Instructions for installing doublers for securing the TKS tank straps.
Outlines modifications to the floorboard assembly for system installation.
Covers the installation of components for the filler port and tank vent outlet.
Details the installation of mounts for routing the filler and vent tubes.
Steps for installing the TKS tank onto the aircraft structure.
Procedures for installing the filler and vent tubing and connecting them to the system.
Describes the installation of bulkhead connectors on the aircraft belly.
Instructions for installing the TKS equipment pallets onto the low-profile fairing.
Details modifications to the fuel reservoir tank sump system.
Steps for installing the XPDR antenna on the forward low-profile TKS fairing.
Guidelines for routing and installing the TKS system nylon tubing and related parts.
Instructions for installing the BLE Lens Assembly for recognition lights.
Procedures for installing Vortex Generators (VG) on the wings.
Steps for installing gurney flaps on the aircraft wings.
Covers the installation of electrical components and wiring for the TKS system.
Instructions for updating the TKS software configuration via the G1000 system.
Procedures for testing the wiring for the circuit breaker panel.
Steps to verify the correct TKS system software configuration.
Steps for preparing the aircraft and system for various tests.
Checks the accuracy and functionality of the fluid quantity indication system.
Tests the operation of the TKS system pumps and fluid flow.
Verifies the functionality of the low pressure switches in the TKS system.
Performs leak tests and tests the high pressure switch functionality.
Detailed steps for purging the TKS system porous panels.
Guide for troubleshooting issues during the panel purge process.
Specific procedures for purging the left wing porous panels.
Procedures for purging the right wing and strut porous panels.
Steps for purging the TKS panels on the horizontal stabilizers.
Instructions for purging the vertical stabilizer TKS porous panel.
Lists circuit breakers to be engaged for the system operational test.
Sets up initial conditions required before performing the operational test.
Tests fluid flow from propeller and windshield spray systems.
Verifies the functionality of wing inspection and navigation lights.
Performs a preflight inspection of TKS system components.