EasyManua.ls Logo

Textron Cessna 208B - System Operational Test; Engaging Circuit Breakers for Test

Textron Cessna 208B
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICE KIT
SK 208-179B
(107)Stop the flui d supply.
(108)Wa it until the uid pressure is released.
(109)Disconnect the purge tank lines.
(110)Install a new S2800-942 Seal ing Ring and conn ect the left horizontal stabilizer TKS supply line
to the tailcone proportionin g unit.
(111) Disc onnec t t he right horizontal stabil izer TKS p anel s upply line from the tailcone proport ioning
unit.
(112)Connect the purge tank lin es to the right horizontal stabilizer TKS panel as near to the pa nel a s
you can.
(113)Apply press ure of 10 psi, do a check for leaks in t he line, and repa ir all leaks.
(114)Apply press ure of 20 psi to slowly start the fluid flow t hrough the pane l.
(115)Wait until the flu id starts to come o ut all the holes at t he same rate along the f ull length of the
panel and increase the pressure to 65 psi.
(116)(Refer to Figu re 13.) Continue the flui d purge until the panel is correc t ly p urged in accordance
with Figure 13 and Table 4.
NOTE: To get an even flow over the panel it may be necessary to lightly run a dry cloth or
paper towel over the leading edge a nd/or the dry spots of the panel during purging.
(117)Stop th e fluid s upply.
(118)Wait until the uid pressure is released.
(119)Disconnect th e purge tank lines.
(120)Install a new S2800-942 Se aling Ring and c onnect the right horizontal stabilizer TKS s upply
line to the tailc one proportioning unit.
(121)Disconnect the vertical stabilizer TK S panel supply line from the tailcon e proportioning unit.
(122)Connect the vertical stabilizer TKS panel supply line directly to the purge cart.
(123)Apply pres s ure of 10 psi, do a check for leaks in t he line, and repa ir all leaks.
(124)Apply press ure of 20 ps i to slowly start the fluid flow through the panel.
(125)Wa it until the flu id starts to come o ut all the holes at t he same rate along the f ull length of the
panel and increase the pressure to 75 psi.
(126)(Refer to Figure 13.) Continue the uid purge until t he panel is correct ly purged in accordance
with Figure 13 and Table 4.
NOTE: To get an even flow over the panel it may be necessary to lightly run a dry cloth or
paper towel over the leading edge a nd/or the dry spots of the panel during purging.
(127)Stop the flui d supply.
(128)Wa it until the uid pressure is released.
(129)Disconnect the purge tank lines.
(130)Install a new S2800-942 Sealing Ring and c onnect the vertical sta bilize r TK S supply line
to the tailcone proportionin g unit.
C. Complete the system operational test a s follows :
(1) Make sure t hat the circuit breakers that follow in Table 5 are engaged:
SK208-179B
February 7, 2013 Page 45

Other manuals for Textron Cessna 208B

Related product manuals