XT1000 Quick Start Guide
Page 1 of 8
Turn your XT1000 on and wait until the instrument has fully completed
its countdown sequence and the display has stabilised.
If turning on for the first time it is advisable to leave the XT1000 for 30
minutes prior to calibration.
Press both the and keys together which will change the display
to Id0000 with the first 0 flashing.
Pressing the up key ( ), allows you to change each 0 to 1, 2, 3 etc.
Pressing the left ( ) and right ( ) keys then moves you to
each position. E.g. _000, 2_00, 28_0, 280_
Change these 0’s to read 2802 which is the factory access code.
Once you have changed Id0000 to read Id2802 press the enter
button.
The XT1000 will then briefly display UnPro to confirm that the
instrument is in the unprotected mode and the parameters can be
altered.
Once it has shown UnPro the display will change to show to dEF (Scale
Definition)
In order to calibrate your system you will first have to define the scale.
For more detail please see section 3.2 in the user manual.