EasyManua.ls Logo

Thermo BTH Ultra - Section 7: TROUBLE SHOOTING; 7.1 TROUBLE SHOOTING TABLE; 7.2 SPARE PARTS; BTH ULTRA LIMITED WARRANTY

Thermo BTH Ultra
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BTH ULTRA Electric Boilers Installation & Operation manual (Revision: May 2015)
4
.
Section 7- TROUBLE SHOOTING......................................................................................................... 23
7.1 TROUBLE SHOOTING TABLE.................................................................................................... 23
7.2 SPARE PARTS ...........................................................................................................................25
BTH ULTRA
LIMITED WARRANTY .......................................................................................................28
Figure 1 : Boiler dimensions (12-24 KW)..................................................................................................1
Figure 2 : Boiler dimensions (27-36 KW)..................................................................................................1
Figure 3 : Mounting positions...................................................................................................................6
Figure 4 : Typical Installation on heating floor ..........................................................................................6
Figure 5 : Typical installation on fin-tube baseboards with zoning valves..................................................7
Figure 6 : Multi-pump zoning....................................................................................................................7
Figure 7 : Typical Installation in Dual-Energy Series.................................................................................8
Figure 8 : Typical installation with three way valve ...................................................................................8
Figure 9 : Zoning with Multiple pumps....................................................................................................11
Figure 10 : Zoning with motorized valves ...............................................................................................12
Figure 11 : Connexions without three way valve.....................................................................................12
Figure 12 : Connexions with three way valve .........................................................................................13
Figure 13 : Wiring diagram (12-24 KW).................................................................................................. 13
Figure 14 : Wiring Diagram (27-36 KW) ................................................................................................. 14
Figure 15 : UltraSmart Controller Display............................................................................................... 15
Figure 16 : UltraSmart Control Module...................................................................................................16
Figure 17 : Back of the controller ...........................................................................................................18
Figure 18 : Spare parts (front, 12-24 KW) ................................................................................................1
Figure 19 : Spare parts (top, 12-24 KW)...................................................................................................1
Figure 20 : Spare parts (front, 27-29 KW) ................................................................................................1
Figure 21 : Spare parts (top, 27-36 KW)...................................................................................................1
Figure 22 : Spare parts (front, 33-36 KW) ................................................................................................1

Table of Contents