EasyManua.ls Logo

Thetford C262CWE - C262 CWE Floor and Water Fill Door Connections

Thetford C262CWE
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
C262CWE
Floor
The C
260
must be
screwed
to
a flat and stable floor
Angle back wall
-
floor
4.2
4.24.2
4.2 Floor connection
Floor connectionFloor connection
Floor connection
Mount the toilet to the floor with four screws.
Screw type
Screws are supplied by Thetford
S
crew positions
See
the
installation drawing
of the
applicable toilet (1.4)
Required torque
1
.
2 ± 0.3
Nm
for a Plywood floor
Torque may differ if the floor is made from a different material.
4.3
4.34.3
4.3 Water fill door
Water fill doorWater fill door
Water fill door
First c
onnect the toilet to the floor a
nd then
install
the waterfill door
. Install the waterfill door
with four screws. For further instructions see the installation instructions of the door.
Extra cut
-
out
outside
wall
A cut
-
out need
s
to be created in the
outside
wall for
the
waterfill door
.
Dimensions cut
-
out
See
the
installation drawing of
the
applicable toilet (1.4)
Screw type
Screws are supplied by Thetford
Required torque
0.5 Nm

Related product manuals