EasyManua.ls Logo

tio TEVO - Page 12

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
INSTALLATION INSTRUCTIONS
1.1 To remove the front cover, please loosen the two retaining screws on the front and hinge off the front cover upwards.
1.2 To mount the product, please use screw holes or by the DIN rail connector molded into the back housing.
*DIN rail not provided*
1.3 For cable entry please use the knock outs provided. Take care not to damage the PCB when removing the knock outs.
1.4 Zones 1-8 Connections: L-N output to thermal actuators (230V)
1.5 Pump connections – 230V Live and neutral output for manifold circulating pump.