7. Installation instruction
1) Installation and test operating
a) When B Series is applied to use, install the hoist to a support structure, switch o
n it as
the nameplate indicated, and push the button to watch the running direction of load
h
ook, if its moving follow the button direction, it means the wires are rightly connected
t
o power supply, otherwise, the connection failure, please correct it by exchanging
any
two wires connection.
b) Before operating a new hoist for its first lifting, it should be operated without load
for 15 minutes to ensure the running is ok, same procedure should be given to a hoist
which has been out of usage for a long time.
’