4. Install the nose cone
Take of the nose cone and add some AB glue(mix it according to 1:1) to stick to the right place on the fuselage.
3
5.Install the landing gear
Take of the main landing gear from box and insert it into the slot of the fuselage. Take of the front landing
gear and insert the steel wire of the front landing gear into the link stopper, then lock the screw by the spanner.
6.Complete the assembly
View from the front, the left and right position, the main wings should be in vertical position to the fuselage.
3.Install the left and right vertical wings and spoiler
Take of the left and right vertical wings from the box and add some AB glue( mix it according to 1:1),
then connect the vertical wings to the fuselage as per the right direction.Take of the left and right
spoiler and glue them to the back slot of the fuselage as per the right direction.
Assemble processes