12
SET-UP INSTRUCTIONS
4. Secure each side of roll bar to mounting brackets
with (2) flange head capscrews and locknuts (Fig. 11).
Torque fasteners to 60 ft-lbs.
5. Secure fuel line vent hose to vent tube on ROPS
with hose clamp.
Fuel line vent hose must be connected to
vent tube prior to starting engine or fuel will
flow from hose.
CAUTION
Figure 11
1. ROPS
2. Mounting bracket
3. Vent tube
4. Fuel line vent tube hose
5. Hose clamp
2
3
1
5
2
4
INSTALL FRONT LIFT ARMS (Fig. 12 - 26)
1. Remove (2) capscrews securing lift arm pivot shaft
link to lift arm pivot shafts. Remove and retain pivot
shaft link and capscrews (Fig. 12).
Figure 12
1. Lift arm pivot shaft link
2. Lift arm pivot shaft
1
2
2. Insert a pivot rod into each (R.H. & L.H.) lift arm and
align mounting holes (Fig. 13).
Figure 13
1
2
1. Lift arm
2. Pivot rod
3. Secure pivot rods to lift arms with a
5/16 - 18 x 7/8" lg. capscrew.
4. Insert R.H. & L.H. lift arms onto lift arm pivot shafts.
Secure with lift arm pivot shaft link and capscrews
previously removed. Torque capscrews to 70 ft-lbs.
5. Remove rear retaining rings securing mounting
pins to each end of lift cylinder.
Figure 14
1. Lift arm (R.H.)
2. Lift arm (L.H.)
3. Retaining ring
1
2
3
5
4
4
4. Mounting pin
5. Lift cylinder
6. Spacer (2)
6
6. Secure right end of lift cylinder to right lift arm with
pin and (2) spacers. Secure with retaining ring.