EasyManua.ls Logo

Toro 03200 - Page 13

Toro 03200
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
SET-UP INSTRUCTIONS
Figure 15
1. Lift cylinder
2. Hoses
3. Clearance here
1
2
3
7. Secure left end of lift cylinder to left lift arm with pin.
Secure with retaining ring.
Note: With lift arms fully raised, hoses should be
routed as shown in figure 15 and clear lift arm by
.04-.12".
MOUNT CARRIER FRAMES TO CUTTING
UNITS (Fig. 16 - 18)
1. Remove cutting units from cartons. Adjust per
Cutting Unit Operator's Manual.
2. Position a front carrier frame (Fig. 16) onto each
front cutting unit. Align mounting holes with mounting
links as shown in figure 18.
Figure 16
1. Front carrier frame
1
3. Position rear carrier frame (Fig. 17) onto rear
cutting unit, aligning mounting holes with mounting
links as shown in figure 18.
Figure 17
1
1. Rear carrier frame
4. Secure each mounting link to carrier frame with a
3/8-16 x 2-1/4" lg capscrew, (2) flatwashers and a
locknut, as shown in figure 18. Position a washer on
each side of link when mounting. Torque to 31 ft-lb.
Figure 18
1. Carrier frame
2. Mounting link
3. Plug
1
2
3
FRONT
MOUNT CUTTING UNITS (Fig. 19-21)
1. Slide a thrust washer onto each front lift arm pivot
rod.
2. Slide cutting unit carrier frame onto pivot rod and
secure with a lynch pin (Fig. 19).
Note: On rear cutting unit, thrust washer to be
positioned between rear of carrier frame and lynch pin.

Related product manuals