High-Wall Type
Installation Manual
–36–
Toshiba
EN
In case of wireless remote controller (Forced
test operation is performed in a different
way.)
REQUIREMENT
For the operation procedure, be sure to follow
the Owner’s Manual.
Finish the forced cooling operation in a short
time because it applies excessive strength to
the air conditioner.
A test operation of forced heating is
unavailable. Perform a test operation by heating
operation using the wireless remote controller.
However heating operation may be not carried
out according to the temperature conditions.
Check wiring/piping of indoor and outdoor
units
1. When pushing button for 10 seconds or
more, “Pi!” sound is heard and the
operation changes to a forced cooling
operation. After approx. 3 minutes, a
cooling operation starts forcedly.
Check cool air starts blowing. If the
operation does not start, check wiring
again.
2. To stop a test operation, push button
once again (Approx. 1 second).
The louver closes and the operation stops.
Check transmission of remote controller
1. Push “ ” button of the remote controller to
check an operation can also start by the
remote controller.
“Cooling” operation by the remote
controller may be unavailable according
to the temperature conditions.
Check wiring/piping of the indoor and
outdoor units in forced cooling operation.
36-EN
+001111052201_00Ta.book Page 36 Friday, November 20, 2009 11:45 AM