EasyManua.ls Logo

Toshiba e-STUDIO211 - Page 113

Toshiba e-STUDIO211
226 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
© 2009 TOSHIBA TEC CORPORATION All rights reserved e-STUDIO181/211
ADJUSTMENT
3 - 31
[A] Installation of the high-voltage transformer jig
(1) Open the bypass tray, ADU and transfer
cover.
(2) Open the front cover and take off the toner
cartridge.
(3) Disconnect 1 connector. Loosen 2 screws
and pull out the process unit.
Note:
Be careful not to let the connector and the
harness be caught when installing the
process unit after adjustment.
Fig. 3-15
(4) Install the high-voltage transformer jig and fix
it with 2 screws.
Note:
Be careful not to let the connector and the
harness be caught.
Fig. 3-16
(5) Fix the green cable of the high-voltage
transformer jig to the frame of the equipment.
Fig. 3-17
ConnectorProcess unit
High-voltage transformer jig
Green cable
Screw

Related product manuals