EasyManua.ls Logo

Toshiba RAS-10UAH-ES3 - Refrigeration Cycle Diagram; RAS-13 UKHP-ES3;RAS-13 UAH-ES3, RAS-13 UKHP-AS3; RAS-13 UAH-AS3

Toshiba RAS-10UAH-ES3
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
FILE NO. SVM-04001
5. REFRIGERATION CYCLE DIAGRAM
5-1. RAS-13UKHP-ES3/ RAS-13UAH-ES3
RAS-13UKHP-AS3 / RAS-13UAH-AS3
Note :
ı Measure the heat exchanger temperature at the center of U-bend. (By means of TC sensor)
*1 ı During heating overload operation, a value for the high temperature limit control operation is included.
Ambient temp.
conditions DB/WB
(°C)
Indoor Outdoor
Standard 2.70 44.0 High 20/15 7/6
Heating Overload*1 3.20 ~ 3.70 52.0 ~ 59.0 Low 27/ 24/18
Low temperature 2.20 35.0 High 20/ 10/10
Standard 0.90 10.0 High 27/19 35/24
Cooling Overload 0.99 14.0 High 32/23 43/26
Low temperature 0.70 2.0 Low 21/15 21/15
Standar d
pressure
P
(MPaG)
Surface temp. of heat
exchang er inter changing
pipe
T1
(°C)
Fan speed
(indoor)
50Hz
Evaporator
Indoor unit
Cross flow fan
Cooling
Heating
4-way valve
Heating
Cooling
Compressor
Accumulator
Condenser
Propeller fan
Outdoor unit
Capillary tube
1.0x600l
Capillary tube
1.5x1100l
PA150X2T-4FM1
Cooling
Heating
Mark( )means check points of Gas Leak.
O.D.:12.7mm O.D.:6.35mm
Cooling
Heating
Packed valve
Packed valve
0.39m
(Connecting pipe)
0.49m
(Connecting pipe)
T1
P
Refrigerant
R410A : 0.95 kg.
(12.7)
(6.35)
12.7
6.35

Table of Contents

Related product manuals