EasyManua.ls Logo

Toshiba RAV-HM1101KRTP-E - Page 44

Toshiba RAV-HM1101KRTP-E
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Manual
43
43-EN
In case of wireless remote controller
(Forced test operation is performed in a
different way.)
REQUIREMENT
For the operation procedure, be sure to follow
the Owner’s Manual.
Finish the forced cooling operation in a short
time because it applies excessive strength to
the air conditioner.
A test operation of forced heating is
unavailable. Perform a test operation by
heating operation using the switches of the
remote controller.
However heating operation may be not
carried out according to the temperature
conditions.
Check wiring/piping of indoor and outdoor
units
1. When pushing [RESET] button for 10
seconds or more and detach [RESET]
button, “Pi!” sound is heard and the
operation changes to a forced cooling
operation. After approx. 3 minutes, a
cooling operation starts forcedly.
Check cool air starts blowing. If the
operation does not start, check wiring
again.
2. To stop a test operation, push [RESET]
button once again (Approx. 1 second).
The louver closes and the operation stops.
OPERATION /
RESET button
Check transmission of remote controller
1. Push “START/STOP” button of the remote
controller to check an operation can also
start by the remote controller.
“Cooling” operation by the remote
controller may be unavailable according
to the temperature conditions.
Check wiring/piping of the indoor and
outdoor units in forced cooling operation.

Other manuals for Toshiba RAV-HM1101KRTP-E

Related product manuals