EasyManua.ls Logo

Toshiba T1200 - 3.10 Async Test

Toshiba T1200
213 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.10
ASYRC
TEST
For
subtest
01
to
subtest
OS,
transmission
is
done
as
follows
in
the
communication.
Speed:
9600
BPS
Data:
8
bits
+
parity
(EVEN)
1
stop
bit
20H
to
7EH
Subtest
01
Wrap
around
(channell)
(Execution
time:
1
second)
Bote:
An
RS232C
wrap
around
connector
must
be
connected
to
channel
1
to
execute
this
test.
RS232C
wrap
around
connector
wiring
diagram
described
in
part
3.22.
Performs
a
data
send/receive
test
with
the
wrap
around
connector
for
the
channell.
Subtest
02
Wrap
around
(channel
2)
(Execution
time:
1
second)
Performs
the
same
test
as
subtest
01
for
the
channel
2.
Subtest
03
Point
to
point
(send)
(Execution
time:
1
second)
Bote:
This
test
can
be
executed
on
condition
that
the
both
send
and
receive
sides
are
set
in
the
same
condition,
and
also
connected
together
by
RS232C
direct
cable
(Wiring
diagram
described
in
part
3.22.
).
Subtest
03
must
be
executed
together
with
subtest
04
and
vice
versa.
In
this
test,
the
data
(20H
to
7EH)
are
sent
as
one
block
from
one
side
to
the
other,
and
then
returned
from
the
later
one
to
the
first
side
again.
This
test
is
used
to
check
wheter
the
returned
data
are
same
as
the
original
ones.
Subtest
04
Point
to
point
(receive)
(Execution
time:
1
second)
This
test
is
exactly
the
same
as
subtest
03
except
that
the
data
flow
is
completely
opposite.
3-21

Other manuals for Toshiba T1200

Related product manuals