Perform all steps of “Check Before Operation”
Purge with system gas (if purging with inert gas, modify this procedure)
Purge should be performed with gas from inlet stem passing through inlet hose,
Zevac machine, and outlet hose, center from discharge tree
Verify Gas Inlet connection is open to system gas
Verify Gas Inlet Pressure indicator correctly indicates system gas pressure
Verify Gas Discharge connection is open to system gas
Verify Gas Discharge Pressure indicator correctly indicates system gas pressure
Record Starting Conditions
• Inlet Gas Pressure
• Discharge Gas Pressure
• Stroke Count
Open Air Control Valve to Start ZEVAC® Operation
Verify smooth and normal ZEVAC® Operation
Always monitor ZEVAC® during operation
Verify Gas Inlet pressure is dropping
Verify Gas Discharge pressure is not rising
Verify adequate air lubrication levels are maintained throughout operation
Verify stroke counters are steadily increasing
Close Gas Intake Isolation Valve
ZEVAC® low-pressure shutoff switch should automatically stop ZEVAC function
Close Gas Discharge Isolation Valve
Open Gas Discharge Vent valve to depressurize ZEVAC® and discharge piping
TRANSPORTATION AND STORAGE
DANGER
Disconnect and Follow Lock-out / Tag-out (LOTO) procedures for all process and energy connections.
WARNING
Stay Clear of Suspended Loads
Observe Accident Prevention regulations in force
Inspect the unit