88-A4AC3001-1H-EN 11
STEP 2 - Remove the pressure tap cap and
valve cores from both service valves.
STEP 3 - Purge the refrigerant lines and indoor
coil with dry nitrogen.
STEP 4 - Wrap a wet rag around the valve body
to avoid heat damage and continue the dry nitro-
gen purge.
Braze the refrigerant lines to the service valves.
Continue the dry nitrogen purge. Do not remove
the wet rag until all brazing is completed.
Important: Remove the wet rag before stopping
the dry nitrogen purge.
Note: Install drier in Liquid Line.
NOTE:NOTE: Precautions should be taken to avoid Precautions should be taken to avoid
heat damage to basepan during brazing. It is heat damage to basepan during brazing. It is
recommended to keep the flame directly off of recommended to keep the flame directly off of
the basepan.the basepan.

Other manuals for Trane A4AC3029A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane A4AC3029A and is the answer not in the manual?

Trane A4AC3029A Specifications

General IconGeneral
BrandTrane
ModelA4AC3029A
CategoryHeat Pump
LanguageEnglish

Related product manuals