Do you have a question about the Trane Horizon OAND Series and is the answer not in the manual?
Refrigerant | R-410A |
---|---|
Series | OAND Series |
Type | Heat Pump |
Cooling Capacity | 18, 000 - 60, 000 BTU/H |
Heating Capacity | 18, 000 - 60, 000 BTU/H |
SEER Rating | Up to 16 SEER |
HSPF Rating | Up to 9 HSPF |
Voltage | 208/230V |
Stages | Single-Stage |
General safety precautions for installation and servicing.
Mandatory PPE requirements for technicians working with the equipment.
Safety warning regarding high-pressure refrigerant systems.
Warnings about potential explosions and toxic gases from refrigerant handling.
Precautions to avoid injury or death during service procedures.
Detailed explanation of the alphanumeric code used to identify unit models.
Details on model nomenclature for Horizon Outdoor Air Units.
Routine checks and procedures for monthly unit upkeep.
Start-up form for Trane Horizon DOAS units.
Procedures for starting up the refrigeration system.
Startup procedure for indirect-fired gas heat units.
Startup procedure for direct-fired gas heat units.
Essential pre-startup checks before operating the unit.
Step-by-step tests for refrigeration system startup.
Procedure for checking and recording voltage readings.
Step-by-step tests for refrigeration system startup.
Checklist for inspecting the unit upon arrival at the job site.
Clearances, curb dimensions, and dimensional data for OAK units.
Detailed unit dimensions for OAN units.
Clearances, curb dimensions, and dimensional data for OAN units.
Clearances, curb dimensions, and dimensional data for OAB units.
Clearances, curb dimensions, and dimensional data for Indirect-Fired OAG units.
Clearances and dimensional data for Outdoor WSHP units.
Clearances, curb dimensions, and dimensional data for Indirect-Fired OAGE units.
Clearances and dimensional data for indoor OAKE units.
Clearances and dimensional data for indoor OANE units.
Clearances and dimensional data for indoor WSHP units.
Clearances and dimensional data for indoor OAGE units.
Clearances, curb dimensions, and dimensional data for OAD units.
Required installation clearances for OAN units.
Clearances and dimensional data for indoor OABE units.
Specifications for unit curb dimensions for OAN units.
Rigging instructions and diagrams for OAN cabinets.
Tables detailing typical operating and shipping weights for units.
Further rigging instructions and diagrams for different lift types.
Diagrams showing rigging methods and center of gravity for different unit configurations.
Checklist for successful commercial unit installation.
Guidelines for verifying power supply and making electrical connections.
Field connection procedures for water lines on WSHP units.
Requirements for venting furnace modules for indoor installations.
Critical safety warning about using the correct vent pipe.
Warning about the risks of carbon monoxide poisoning.
Procedure for checking and correcting electrical phasing for three-phase motors.
Safety warnings for field-installed control wiring and grounding.
General procedures and checks before unit startup.
Steps for starting up indirect-fired gas heating systems.
Procedures for initiating cooling operation, including temperature limits.
Detailed steps for starting up indirect-fired gas heating units.
Safety warning regarding leak testing procedures.
Procedure to check and verify inlet gas pressure.
Steps to confirm gas flow to the unit.