EasyManua.ls Logo

Trane TTA120C series - User Manual

Trane TTA120C series
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installation
Operation
Maintenance
Split System Cooling Condensers
7 1/2 - 20 Tons
September 2004
Models:
(60 Hz)
TTA090A***F
TTA120A***F
TTA120B***E
TTA120C***G
TTA150B***E
TTA180B***F
TTA180C***G
TTA240B***F
TTA-SVX02C-EN
18-AC60D8-1
(50 Hz)
TTA075AD**F
TTA085AD**F
TTA100AD**F
TTA100BD**E
TTA100CD**G
TTA125BD**E
TTA155BD**F
TTA155CD**G
TTA200BD**F
Question and Answer IconNeed help?

Do you have a question about the Trane TTA120C series and is the answer not in the manual?

Trane TTA120C series Specifications

General IconGeneral
BrandTrane
ModelTTA120C series
CategoryAir Conditioner
LanguageEnglish

Summary

Electrical Data

TTA Unit Electrical Data

Presents electrical characteristics, compressor motor, and outdoor fan motor data for TTA units.

Installation

Initial Leak Test

Procedure to check refrigerant circuits for leaks using nitrogen pressure before system operation.

Lifting Recommendations

Guidelines for safely lifting the unit, including weight considerations and use of lifting equipment.

Refrigerant Piping

Guidelines for routing and installing refrigerant lines, including length and pressure drop considerations.

Refrigerant Piping Procedures

Detailed steps for connecting refrigerant lines to outdoor and indoor units, including brazing and purging.

Leak Check

Method for checking field-brazed refrigerant line connections for leaks using soap bubbles.

System Evacuation

Procedure for evacuating the refrigerant system to a specific micron vacuum level.

Refrigerant Charging Procedure

Instructions for charging the system with refrigerant based on weight or specific model requirements.

Gaseous Charging

Procedure for charging the unit with refrigerant while it is operating, ensuring proper superheat and subcooling.

Electrical Wiring

Overview of field wiring requirements, including power supply and low voltage connections.

Unit Power Supply

Details on providing line voltage, disconnect switches, and grounding for the unit's power supply.

System Pre-Start Procedure

Safety Controls

Details on various safety controls like Evaporator Defrost Control, LPCO, HPCO, and Internal Overload Protector.

System Start Procedure - Electro Mechanical Controls

System Start Procedure - ReliaTel Controls

Trouble Shooting ReliaTel Controls

System Status Checkout Procedure

Methods for checking unit system status, including LED indicators and voltage measurements.

Simultaneous Heat and Cool Failure

Addresses issues where both heating and cooling modes fail simultaneously, often related to emergency stop.

System Status Check Method 2

Details checking system status via voltage readings at RTRM terminals and power cycling.

Maintenance

Related product manuals